bop_handling_crane.jpg

BOP Handling Crane Upgrade

Client: Dolphin Drilling AS
Installation: Borgland Dolphin
Installation of radio remote system and anti-collision of trolleys on BOP crane


bulk_loading_stations.jpg

Bulk Loading Stations

Client: Floatel International
Installation: Floatel Superior
Delivery of bulk loading station for a Floating Accommodation Unit
The project was delivered including onboard installation and testing of complete all electric bulk loading station. The electric type of drive ensure minimum risk for oil spill and minimum noise during operation.


maintenance_of_lifting.png

Maintenance of lifting and drilling equipment

Client: Multiple
Installation: Multiple
Plan and perform preventive and corrective maintenance of lifting and drilling appliances. This includes all from condition assessment, establishing work packages, ordering spare parts and final check and document updates in CMS system.


material_handling_solution.png

Material Handling Solution

Client: Reinertsen AS
Installation: Oseberg D
Delivery of temporary rigging crane for Oseberg Delta 2 project.
The crane is hired out for solving project specific material handling needs.


new_riser.png

New riser handling solution for drilling rig

Client: Transocean Offshore Inc
Installation: Transocean Leader
EPCI of a new riser handling crane. We performed this project from a feasibility study to final certified riser handling crane


offshore_crane.jpg

Offshore Crane Pedestal Analysis

Client: Statoil Petroleum AS
Installation: FPSO Norne
Structural and fatigue analysis of offshore crane pedestals and support structure for extended lifetime evaluation together with assessing the possibilities of replacing the offshore cranes.


offshore_crane_upgrade_4.jpg

Offshore Crane Upgrade of emergency operation system

Client: COSL Drilling Europe
Installation: COSL Rival
Delivery and installation of an automated emergency operation system on the Liebherr crane on COSL Rival.


offshore_crane_upgrade_2.jpg

Offshore Crane Upgrade

Client: Transocean Offshore Inc
Installation: Transocean Winner
Upgrade of two offshore cranes to comply with new rules and regulations. That implied a solution with new control system, new hydraulic system, new luffing winch and access for inspection and maintenance as main upgrades. The project was compiled during yard stay


offshore_crane_update_3.jpg

Offshore Crane Upgrade

Client: Transocean Offshore Inc
Installation: Transocean Arctic
Upgrade of an offshore cranes to comply with new rules and regulations. That implied a solution with new control system, crane operator environment and access for inspection and maintenance as main upgrades.


riser_pull-in-winch.png

Riser Pull in Winch

Client: Aker Solutions AS
Installation: Åsgard A
Complete overhaul and operation of Riser Pull in Winch. All main component were disassembled, factory overhauled, reassembled and tested.


riser_pull_in_winch_2.png

Riser Pull in Winch

Client: Teekay Petrojarl Production AS
Installation: FPSO Petrojarl 1
Planning, engineering and execution of riser pull-in operation.


offshore_crane_upgrade_4.jpg

Offshore Crane Upgrade

Client: COSL Drilling Europe
Installation: COSL Rival
Delivery and installation of new crane control system on the MoldeCrane on COSL Rival.


riser_handling_crane_upgrade.png

Riser Handling Crane Upgrade

Client: Dolphin Drilling AS
Installation: Borgland Dolphin
Upgrade of Riser Handling Crane from 15 to 30 tons SWL by upgrading lifting system from 1 part to 2 part lifting.


spooling_winch.png

Spooling Winch with back-tension

Client: Different
Installation: For Rental
Spooling winch for use to replace wire. The spooling winch is powered by air and can turn and tilt to pick up and release winch drums without crane assistance.
The back-tension can be adjusted to suit different applications to comply with NORSOK R-002 recommendations for applying back-tension.